If you apply for Apply for a building permit in Radolfzell am Bodensee (Baden-Württemberg), expect about approx. 3 months. Bauordnungsamt – Konstanz (zuständig für Radolfzell am Bodensee) is responsible.
Quick answer
Documents you need
Site Map · Construction drawings · Building Specifications
Costs
Kostenlos bis 150 € je nach Leistung
approx. 3 months in Radolfzell am Bodensee
In Radolfzell am Bodensee we expect around approx. 3 months processing time – based on reports from the region, not on official figures.
Official: max. approx. 3 months
Have building plans prepared
The building permit application must be submitted by an architect or engineer authorized to file building permit applications.
Submit an application to the building department
Including site plan, construction drawings, building specifications, and structural analysis.
Review and Participation
The building department reviews building plans and building codes, and consults with neighbors and relevant authorities as necessary.
Obtained a building permit
Once the permit has been issued, construction may begin (please note the notice of commencement of construction).
Who is eligible?
Developers of projects requiring a permit (depending on state building codes and the type of project).
Income limit
Success rate
approx. 82.0 % (estimate)
File a written objection within 30 days – with reasons why the decision is wrong and any missing evidence.
Statutory deadlines range from 1 to 3 months depending on the state; in practice, 2 to 6 months is a more realistic timeframe.
Responsible authority
Regional specifics
Form
Form
Preliminary determination of approval eligibility without complete construction documents