Apply for a carport building permit

A building permit is required for the construction of a carport on private property, depending on the state and the size of the structure.

Processing: approx. 3 weeks
Success rate: 82.0 %

How to proceed

  1. 1

    Check for state-specific procedural flexibility

    Many states allow carports up to a certain size without a permit.

  2. 2

    Submit a building permit application to the building department

    Including a site plan, floor plan, and calculation of clearance distances.

  3. 3

    Obtain a building permit and build a carport

    Only after approval or after the expiration of the objection period in notification proceedings.

Required documents

  • Site Plan / Cadastral MapMandatory

    A scale drawing of the property showing the carport.

Responsible authority

The authority of your main place of residence is responsible.Find authority →

Fees

Varies by case

Processing time

approx. 3 weeks

Official: max. approx. 1 months

Online application

In person or by post

Common mistakes

  • Carport built without a permit (at risk of demolition)
  • Building permit application submitted without a site plan

Common reasons for rejection

  • The required setback from the neighboring property has not been met
  • The size exceeds the procedural freedom limit of the respective state

You can usually file an objection against a rejection.

The essentials before applying

Who is eligible?

Homeowners who want to build a covered parking space.

Income limit

The limit varies by household and region – see the table at the responsible authority or in the application assistant.

Processing time

Nationwide: approx. approx. 3 weeks

Success rate

approx. 82.0 % (estimate)

Most common mistakes

  • Carport built without a permit (at risk of demolition)
  • Building permit application submitted without a site plan

Common reasons for rejection

  • The required setback from the neighboring property has not been met
  • The size exceeds the procedural freedom limit of the respective state

Alternatives

  • Check related services in the application assistant
  • Use social counselling before applying

If rejected

File a written objection within 30 days – with reasons why the decision is wrong and any missing evidence.

Questions & Answers

Do I always need a permit for an open carport?

That depends on the state and the size. In many states, carports up to about 50 m² do not require a permit as long as the required setbacks are observed.