Obtain approval for a loft conversion

Building permit for the expansion or conversion of an attic into living space.

Processing: approx. 1 months
Success rate: 80.0 %

How to proceed

  1. 1

    Have the project reviewed for compliance with building codes

    Check the zoning plan and floor area ratio; if necessary, submit a preliminary inquiry to the building department.

  2. 2

    Submit a building permit application with plans and structural calculations

    Floor plans, cross-sections, elevations, and structural analysis are required.

  3. 3

    Obtain a building permit and begin construction

    Comply with the thermal and sound insulation requirements of the EnEV / GEG.

Required documents

  • Structural analysisMandatoryOften forgotten

    Verification of the roof truss's load-bearing capacity by a structural engineer.

Responsible authority

The authority of your main place of residence is responsible.Find authority →

Fees

Varies by case

Processing time

approx. 1 months

Official: max. approx. 1 months

Online application

In person or by post

Common mistakes

  • Renovation work has begun without structural analysis
  • Retroactive thermal insulation certification is missing

Common reasons for rejection

  • The zoning plan does not allow for an increase in the floor area ratio
  • is precluded by historic preservation regulations

You can usually file an objection against a rejection.

The essentials before applying

Who is eligible?

Homeowners who want to convert their attic into living or utility space.

Income limit

The limit varies by household and region – see the table at the responsible authority or in the application assistant.

Processing time

Nationwide: approx. approx. 1 months

Success rate

approx. 80.0 % (estimate)

Most common mistakes

  • Renovation work has begun without structural analysis
  • Retroactive thermal insulation certification is missing

Common reasons for rejection

  • The zoning plan does not allow for an increase in the floor area ratio
  • is precluded by historic preservation regulations

Alternatives

  • Check related services in the application assistant
  • Use social counselling before applying

If rejected

File a written objection within 30 days – with reasons why the decision is wrong and any missing evidence.