If you apply for Report / Obtain Permission for Water Use in Mayen-Koblenz (Rheinland-Pfalz), expect about approx. 2 months. Untere Wasserbehörde – Kreisverwaltung Mayen-Koblenz (zuständig für Mayen-Koblenz) is responsible.
Quick answer
Documents you need
Identification card or passport · Form / Application
Costs
Je nach Gemeinde und Leistung – beim zuständigen Amt erfragen
approx. 2 months in Mayen-Koblenz
In Mayen-Koblenz we expect around approx. 2 months processing time – based on reports from the region, not on official figures.
Official: max. approx. 3 months
Submit an application to the local water authority
Including a description of the type, scope, and duration of the water use.
Technical review
If necessary, other specialized agencies (e.g., wildlife conservation, public health department) may be involved.
Obtain a permit or authorization
Usually temporary and subject to additional conditions.
Who is eligible?
Property owners and businesses that wish to withdraw water, discharge water, or make structural changes to water bodies.
Income limit
Success rate
approx. 75.0 % (estimate)
File a written objection within 30 days – with reasons why the decision is wrong and any missing evidence.
This varies by municipality and service—check with the appropriate agency.
Typically about 60 business days—depending on the agency and its workload.