Obtain a permit for a rainwater harvesting system in Lörrach

In Lörrach we expect about approx. 2 weeks processing time for Obtain a permit for a rainwater harvesting system – responsible: Untere Wasserbehörde Landkreis Lörrach.

Last reviewed: September 13, 2026Verified sources:Untere Wasserbehörde Landkreis LörrachBundesportal (verwaltung.bund.de)

Quick answer

  1. 1

    Documents you need

    Identification card or passport · Form / Application

  2. 2

    Costs

    Kostenlos bis 150 € je nach Leistung

Processing time

approx. 2 weeks in Lörrach

In Lörrach we expect around approx. 2 weeks processing time – based on reports from the region, not on official figures.

Official: max. approx. 4 weeks

How to proceed

  1. 1

    Report the facility to the Lower Water Authority

    In most states, a notification is sufficient; no permit is required.

  2. 2

    Check technical requirements

    Separation of drinking water, backflow prevention, and pipe labeling.

  3. 3

    Operation of the system

    Upon receipt of the report and, if necessary, confirmation from the authorities.

Required documents

  • Identification card or passportMandatory
  • Form / ApplicationMandatory

The essentials before applying

Who is eligible?

Homeowners who want to use rainwater for flushing toilets, watering their gardens, or running their washing machines.

Income limit

Success rate

approx. 90.0 % (estimate)

Most common mistakes

  • System commissioned without a display
  • No backflow prevention

Common reasons for rejection

  • Lack of separation between the drinking water and stormwater systems

Alternatives

  • Check related services in the application assistant
  • Use social counselling before applying

If rejected

File a written objection within 30 days – with reasons why the decision is wrong and any missing evidence.

Everything about Obtain a permit for a rainwater harvesting system

Questions & Answers

How much does it cost to get a rainwater harvesting system approved?

Free up to €150, depending on the service.

How long does it take to get a rainwater harvesting system approved?

Typically about 14 business days—depending on the agency and its workload.