Apply for a grant for photovoltaic/solar systems

A grant or low-interest loan for the installation of photovoltaic or solar thermal systems, depending on the program offered by BAFA, KfW, or the state development bank.

Processing: approx. 2 months
Online application possibleSuccess rate: 70.0 %

How to proceed

  1. 1

    Select a grant program

    BAFA, KfW, or the state development bank, depending on the type of equipment and the federal state.

  2. 2

    Submit a request before awarding the contract

    Including the technical specifications of the planned facility.

  3. 3

    Installation and Proof of Use

    Once the work is complete, submit proof of proper installation.

Responsible authority

The authority of your main place of residence is responsible.Find authority →

Fees

Varies by case

Processing time

approx. 2 months

Official: max. approx. 2 months

Online application

Online possible – at the responsible authority

Common mistakes

  • Eligibility requirements have not been reconciled with those of other subsidies (e.g., feed-in tariffs)
  • Application submitted only after the contract with the installation company was signed

Common reasons for rejection

  • The application was submitted only after the installation company had been hired
  • Minimum technical requirements (e.g., efficiency) not met

You can usually file an objection against a rejection.

The essentials before applying

Who is eligible?

Owners of residential and commercial properties who wish to install a solar power system.

Income limit

The limit varies by household and region – see the table at the responsible authority or in the application assistant.

Processing time

Nationwide: approx. approx. 2 months

Success rate

approx. 70.0 % (estimate)

Most common mistakes

  • Eligibility requirements have not been reconciled with those of other subsidies (e.g., feed-in tariffs)
  • Application submitted only after the contract with the installation company was signed

Common reasons for rejection

  • The application was submitted only after the installation company had been hired
  • Minimum technical requirements (e.g., efficiency) not met

Alternatives

  • Check related services in the application assistant
  • Use social counselling before applying

If rejected

File a written objection within 30 days – with reasons why the decision is wrong and any missing evidence.